Engineering Field Guides
CLI-level operational reference material for production storage, networking, and infrastructure work. Written by WUC engineers from real engagement experience — not vendor marketing.
Each guide covers a specific operational procedure: change-control framing, command sequences with annotations, single-initiator best-practice notes, verification steps across Linux / Windows / ESXi where applicable, and an explicit “when to escalate to WUC” boundary.
Cisco MDS Zoning: A Field Guide for NetApp AFF Dual-Fabric Setups
CLI reference for creating zones, decommissioning hosts, and swapping HBA WWPNs during hardware replacement on Cisco MDS switches paired with NetApp AFF storage. Covers SIST best practice, show zone pending-diff safety gates, and host-side path verification on Linux, Windows, and ESXi.
Field guides currently in draft
WUC engineers run production fabrics for a living
If you’re mid-incident or pre-cutover and need a peer-reviewed CLI script with rollback rehearsed in lab — we own the change window for you. Multi-OEM, tiered SLAs, SOC 2 audit-ready operations.